What is Commissioning?
Commissioning is a crucial multi-day process designed to ensure that MVP systems are installed without error and function correctly for our customers. This routine involves multiple scalable parts including Installation Setting to Work (ISTW), Harbor Acceptance Test (HAT) and a Sea Acceptance Test (SAT). Our customers benefit from thorough training sessions and face-to-face time with our team. From the moment the system arrives at your location to its completed operational setup, we provide expert guidance and support.
- Preparation: Extensive communication between our team and the customer to determine installation details including mounting locations and system integration specifics.
- Unpackaging the System: Begin with safely transporting the crate onto the vessel and unpacking the system components.
- Installation: Confirm deck mounting, routing of cables, and hydraulic fluid requirements are met.
- Training: Key personnel are trained on-site to ensure they are well-versed in operating the system.
- Acceptance Tests: Conduct Harbor and Sea Acceptance Tests to validate system performance.
- Final Verification: We ensure a positive experience and confident customers through a comprehensive test run of deployment, set-up, and recovery of the system.